Arlington National Cemetery

Millennium Site Expansion Project – Arlington, VA

 

Contract Number: W91236-13-R-0012

Construction Timeframe: 2014 - 2016

G&C Fab-Con was a super sub-contractor for this project and self-performed approximately 99% of the work related to their subcontract, including the installation of 6,271 precast concrete burial crypts, 16,400 columbarium niches, backfill and compaction, and topsoil amendment/ placement.  This project was awarded to Forrester Construction (Prime), G&C Fab-Con, LLC. (Super Sub) in 2014.  G&C completed all of their subcontract work in 2016.

Gallery

Calverton National Cemetery

Calverton, NY

 

Contract Number: VA101CFM-C-0054

Construction Timeframe: 2009 - 2011

Development of a 90-acre site in an active national cemetery including clearing and grubbing, erosion control, roadways and curbs, landscape placement and maintenance, turf placement and maintenance, irrigation, new signage, site furnishings, renovations to existing administration and maintenance facilities and seven committal shelters, and a new guard booth. Approximately 80% of the work was self-performed with G&C Fab-Con as the controlling member in a Joint Venture project including repair and paving of existing roadways, as well as construction of over 8,000 linear feet of new roadways, supply of 28,000 concrete crypts and installation of 33,000 concrete crypts including triple and oversized units, and a complete columbarium complex containing 4,836 columbarium niches.

Gallery

Cape Canaveral National Cemetery

Mims, FL

 

Contract Number: VA101-14-C-0040

Construction Timeframe: 2015 – 2017

Development of a 96-acre site for a new national cemetery including general construction, clearing and grubbing, erosion controls, roads, paving, walks, site preparation, storm and sewer work, landscaping placement and maintenance, turf placement and maintenance, irrigation, site furnishing, fencing, signage, flag assembly area, ossuary, three memorial walls, new entrance area, new administration building/PIC, maintenance plaza including main building and honor guard area. Approximately 25% of the work was self-performed including the installation of 17,700 interment sites comprised of 7,553 preplaced crypts, 6,800 columbarium niches, 2,752 in ground urn crypts, and 162 oversize crypts, all earthmoving, grading and drainage for six crypt fields. Additional work included 383 private plots and an early turnover area within 12 months of notice to proceed. Project followed LEED guidelines and has been awarded LEED Silver Certification.

Gallery

Florida National Cemetery

Bushnell, FL

Florda National Cemetery_aerial.jpg

Contract Number: 36C10F18C3375

Construction Timeframe: Currently Under Construction

This project will develop approximately 40 acres of undeveloped land to provide approximately 50,350 gravesites, including both casket and cremation sites in new burial sections. This project will also provide a new Honor Guard building, a new Satellite Public Restrooms, and renovations to the existing Maintenance facilities and Committal Service Shelters. Project will also address corrections and repairs as identified by the Facility Condition Assessment (FCA) Report, including lightning protection. The latest technology in energy efficiency, LEED and Green Globe building requirements will be incorporated into this project where economically feasible.

Gallery

Gerald B.H. Solomon Saratoga National Cemetery

Schuylerville, NY

 

Contract Number: VA786A-C-0047

Construction Timeframe: 2007 - 2009

Development of a 25-acre site in an active national cemetery including clearing and grubbing, erosion control, 2,500 feet of roadways and curbs, sidewalks and site pads, turf placement and maintenance, landscaping placement and maintenance, irrigation, site furnishings, signage and two committal shelters. Approximately 70% of the work was self-performed including supply and installation 5,700 burial crypts, development of 8 burial sections for standard caskets and garden niches, and a complete columbarium complex with 38 walls consisting of 4,584 columbarium niches along with all earthmoving, grading, drainage systems for new crypt fields.

Gallery

Indiantown Gap National Cemetery

Annville, PA

 

Contract Number: VA101CFM-C-0165

Construction Timeframe: 2011- 2013 (3 months ahead of schedule)

Design and development of a 30-acre site in an active national cemetery including general construction, general alternations, general demolition, clearing and grubbing, erosion controls, roads, paving, walks, site preparation, grading, drainage and storm sewer work, earthwork, landscaping, irrigation, site furnishings, fencing, signage, two new committal shelters, administration building renovations, and new honor guard building. Approximately 48% of the work was self-performed including the installation of 7,300 precast concrete burial crypts and 5,500 columbarium niches, all earthmoving, grading and drainage systems for four crypt fields and construction of two columbarium complexes totaling 67 walls.

Gallery

Jacksonville National Cemetery

Jacksonville, FL

Jacksonville_1.jpg

Contract Number: 36C10F18C3383

Construction Timeframe: Currently Under Construction

This project will develop approximately 40 acres of undeveloped land to provide approximately 50,350 gravesites, including both casket and cremation sites in new burial sections. This project will also provide a new Honor Guard building, new Satellite Public Restrooms, and renovations to the existing Maintenance facilities and Committal Service Shelters. Project will also address corrections and repairs as identified by the Facility Condition Assessment (FCA) Report, including lightning protection. The latest technology in energy efficiency, LEED and Green Globe building requirements will be incorporated into this project where economically feasible.

Gallery

National Cemetery of the Alleghenies

Gravesite Expansion - Bridgeville, PA

 

Contract Number: VA786-16-C-0026

Construction Timeframe: 2016 - 2017

Development of a 8-acre site in an active national cemetery including site improvements, clearing and grubbing, erosion control, roadways and curbs, sidewalks and site pads, turf placement and maintenance, landscaping placement and maintenance, irrigation, site furnishings, signage. Approximately 65% of the work was self-performed including installation of 2,800 preplaced crypts, and 2,000 in ground cremains sites, along with all earthmoving, grading, and drainage systems for new crypt fields.

Gallery

Queen of Angels Catholic Cemetery

Orlando, FL
Queen_of_Angles_1.jpg

Project Name: Queen of Angels Cemetery

Client Name: Diocese of Orlando

Contract No.: 21560-001

Construction Timeframe: 5/2019 – 12/2019

The 48-acre site is home to the first diocesan cemetery for lay persons in the Diocese of Orlando. The first phase of construction of two acres at Queen of Angels contains more than 1,300 pre-installed burial vaults, a cremation garden of more than 800 cremation burial lots, including an assortment of columbaria niches, and areas set aside for family memorials. In addition to the outdoor burial options, the cemetery includes a columbarium building of more than 600 indoor, glass front niches in an air-conditioned, comfortable setting.

Gallery

Veterans Medical Center – Manhattan Campus

New York City, NY

 

Contract Number: VA101F-14-C-0018

Construction Timeframe: 2014 - 2015

Preparation of site for renovations in an active hospital including demolition and removal of existing structures, renovations and repairs to existing interior shops, religious chapel, morgue and security rooms. Alterations and expansions included associated mechanical, electrical, plumbing and elevator systems.

Gallery

Washington Crossing National Cemetery

Newtown, PA

 

Contract Number: VA101CFM-C-0082

Construction Timeframe: 2010 - 2012

Design and development of a 64-acre site in an active national cemetery including clearing and grubbing, erosion control, roadways and curbs, sidewalks and site pads, turf placement and maintenance, landscaping placement and maintenance, irrigation, site furnishings, signage, 3,600 cremains plots, 2 new memorial walls, flag assembly area, new building construction and renovations. Approximately 40% of the work was self-performed including fabrication, supply and installation of 10,031 precast concrete burial crypts and 4,140 columbarium niches, all earthmoving, grading, drainage systems for five crypt fields and the construction of one columbarium complex totaling 32 walls.